Library / Service Manual Page 46

Service Manual — page 46 of 715

Periodic Maintenance › Evaporative Emission Control System Inspection (Other than US, CA, ID and SEA-B2 Models)

Service Manual page 46 — Periodic Maintenance › Evaporative Emission Control System Inspection (Other than US, CA, ID and SEA-B2 Models)
Tap the page to zoom. Open the full-size image

Text on this page

2-24 PERIODIC MAINTENANCE
Periodic Maintenance Procedures
Evaporative Emission Control System Inspection
(Other than US, CA, ID and SEA-B2 Models)
•○Inspect the canister as follows.
  Remove the meter cover (see Meter Cover Removal in
 the Frame chapter).
○Slide the clamps [A].
○Disconnect the hoses [B].
○Remove:
   Band [C]
   Canister [D]
○Visually inspect the canister for cracks or other damage.
 If the canister has any cracks or bad damage, replace it
 with a new one.
                          NOTE
 ○The canister is designed to work well through the motor-
   cycle’s life without any maintenance if it is used under
   normal conditions.

• Inspect the purge valve (see Purge Valve Operation In-
  spection in the Fuel System (DFI) chapter).
○Check that the hoses are securely connected and clips
 are in position.
○Replace any kinked, deteriorated or damaged hoses.
○Run the hoses according to Cable, Wire, and Hose Rout-
 ing section in the Appendix chapter.
○When installing the hoses, avoid sharp bending, kinking,
 flattening or twisting, and run the hoses with a minimum of
 bending so that the emission flow will not be obstructed.