Library / Service Manual (KLZ1000C) Page 466

Service Manual (KLZ1000C) — page 466 of 762

Frame › Upper Fairing Bracket Installation

Service Manual (KLZ1000C) page 466 — Frame › Upper Fairing Bracket Installation
Tap the page to zoom. Open the full-size image

Text on this page

15-22 FRAME
Fairings
Upper Fairing Bracket Installation
• Installation is the reverse of removal.
• Run  the leads correctly (see Cable, Wire, and Hose Rout-
  ing section (18-2)).
• Tighten:
 Torque - Upper Fairing Bracket Bolts (M8): 25 N·m (2.5
            kgf·m, 18 ft·lb)